Allegro Aureus - Ongoing Project

  • 37 well-planned, spacious and well-ventilated Apartments spread on 10 floors.
  • Security kiosk at entry. Intercom Connection cum colour Video Door Phone connection to all the Apartments. Round-the-clock security with 24 CCTV cameras. Access card system will be provided.
  • Spacious and systematic car parking (extra cost) for all Apartments. Wide driveways for unhindered maneuvering of vehicles. Remote control operated Main Gate.
  • Free visitors’ car parks and sufficient two-wheeler parks.
  • Spacious, fully-furnished and well-designed Visitors’ Lobby.
  • Two fully-automatic lifts (Schindler ) one of 8 passengers’ and one of 13 passengers’ capacity with 1.5 Metres /Second speed.
  • Wide Staircase and separate Fire Escape Staircase.
  • Landscaping and water bodies at appropriate places for greater aesthetic look.
  • Firefighting equipments on all floors with fire extinguisher Pump House as per NBC.
  • MESCOM power of 8 KW for 4 BHK (3 phase), 6 KW for 3 BHK (3 phase) and 4 KW for 2 BHK apartments.
  • 100% Backup Generator power for Apartments and common areas. Separate Meters for Back-up power for each Apartment.
  • Split A/c provision for Living and Bed Rooms.
  • 24 hours water supply sourced from Corporation connection and Bore Well.
  • Reticulated Gas supply to all Apartments (extra cost) with a smart card system. (Optional)
  • WiFi Data connectivity. (service charges applicable)
  • Purified water outlet in every Kitchen from Reverse Osmosis Water treatment plant from a separate SS Tan /Filtered water for the kitchen, washing machine and wash basins from a separate O/H Water Tank. Separate O/H water tank for flushing.
  • Rain water harvesting.